
Model: RUG-280
Fuel valve controller and start-up ramp generator
The controller sets the turbine’s main fuel valve from speed and temperature (0–50 mA output), and the RUG-280 ramp generator produces the start-up signal.
Features
- 0–50 mA valve drive output
- +28 V DC ramp generator supply
- Two independent ramp outputs
Applications
- Industrial gas turbines
Installed in
Need a different voltage, size or interface? We will design and build the unit to your specification. To request a quote, send your request through the Atirame chat.
Request a quoteRelated projects
- Speed and temperature control units for industrial gas turbines, three contractsAhvaz · 2020